ZE PAK S.A. Construction of a biomass storage and transport installation
Investment:
| ZE PAK S.A. Construction of a biomass storage and transport installation |
Object of the investment: | Construction of the installation for unloading, storage, preparation and transport of biomass to the CFB 154 MWt biomass-fired boiler along with infrastructure |
City:
| KONIN |
Date of commencement:
| 2011 |
Description : | Construction of installations for unloading, storing, preparing and transporting biomass to the CFB 154MWt boiler fired with biomass. Access roads and maneuvering yards with the associated infrastructure. Landfills and storage silos for forest and agro biomass with a total capacity of 47,000 m3. Conveyor routes transporting biomass from the biomass storage area to the boiler bunkers; |