POLISH ENERGY PARTNERS at Zakłady Celulozowe FRANSCHACH ŚWIECIE S.A.
Investment: | POLISH ENERGY PARTNERS at Zakłady Celulozowe FRANSCHACH ŚWIECIE S.A. |
Object of the investment: | Expansion of the boiler house along with the construction of a fluidized bed boiler and accompanying infrastructure. |
City: | Świecie |
Date of commencement:
| 2002-01 |
Description
| Construction of a heat and power plant (fluidized bed boiler facility, transfer facility, storage yards, linear engineering structures, flyovers for biomass and coal conveyors) Implementation June 2002 - November 2003 facility - fluidized bed boiler, height 56 m, construction works (building area 970 m2, volume 51,000 m3), transfer facility (building area 310 m2, volume 3 100 m3), coaling flyover (65 m long) with reconstruction of part of the existing boiler house; biomass conveyor flyover (length 340m, height 40m); conveyor tunnel (underground structure ca 85m); storage yards with reclaimers; underground infrastructure; reconstruction of the existing technological flyovers; deslagging flyover to the silo; technological foundations of the silo and electrostatic precipitators, etc. Cooperation within the framework of the General Contractor: TESSAG (Canada). Technological cooperation: FMW (Austria), AEE (Austria), ABB, BMT, Energomontaż, Jaakko Pöyry, Karrena. The total value of the investment amounted to approx. PLN 50 million. EURO |