GONVARRI Steel Service Factory
Investment:
| GONVARRI Steel Service Factory |
Object of investment: | Foundation for the technological line of the longitudinal cutting line, intermediate foundation (piling), monolith, implementation in the mode of a functioning factory |
City: | Września |
Date of commencement:
| 2005-01 |
Description: | The foundation for the technological line of the longitudinal cutting line consists of two main separate parts. The load-bearing structure of the deep excavation (about 8 m below the floor surface) is made of monolithic walls with a thickness of about 70 cm. Walls made in the technology of taking over the ground tension by the previously made DSM palisade, located approx. 1.5 m outside (11 m deep) from the designed outline of the wall. The second part is an 80 cm thick plate with a lot of bends in local depressions and places for anchoring the machine. Foundation dimensions: width 24.0 m length 32.0 m Implementation of the task within the functioning plant. |